The high frequency vibration of high pressure piping has strict requirements on the assembly of the lens gasket of the high pressure flange. Before the assembly should be inside pipeline, pipe threaded end and tapered sealing surface, gaskets, high pressure flange and bolts, nuts and all the clean up, and check the appearance, when necessary, then coloring, magnetic or ultrasonic flaw detection. Any seals shall have crack; surface defects, which the pipe threaded end, high pressure flange, bolt and nut thread of the effective part of tooth high corrosion and wear shall not exceed 10% of the standard tooth height, each lap mechanical damage length should not be more than 1 / 5 of the perimeter, each circle and not larger than the circumference of a circle, bolt rod section shall not corrosion or mechanical damage; overproofed defects should be replaced in a timely manner. In the assembly process, attention should be paid to maintain a clean sealing surface, and strictly control the bolt of flange preload, the hydraulic tightening device or measuring torque wrench symmetric fastening.
Stud bolt tightening after the elongation control in general is not more than 3 / 10 000 bolt length, high temperature control between the 3 / 10 000 ~ 5 / 10 000 bolt length, bolt ends exposed outside the nut thread length should be equal as far as possible and not less than 2 times the pitch, to remove more than twice the bolt pre tightening force of around 6% increase. Installation shall not use forced assembly and a requirement to keep two flanges parallel to the end surface, the parallel deviation control within 0.3mm, keep the two flanges on the axial center line of the coaxial, coaxiality error depending on the diameter size control in less than 0.3 ~ 0.5mm range, to really confidential cover good contact and prevent bad moment. Keep a good surrounding environment, do a good job of dampproof, dustproof and anti rust and other maintenance work, and according to the working temperature of the level of discretion in the high pressure bolt coated powder lubricating oil or grease molybdenum disulfide. Pipeline running at high temperatures, the general should be in keeping the temperature test operation 24h after, tube pressure relief to 0.5MPa (gauge) following then moderate fastening force will flange bolts in hot tight to seal the pretightening force; pipeline running at low temperatures, in keeping the temperature test operation 24h after unloading despite internal pressure and with methanol on the surface of the bolts of flanges.
Source: wilsonpipeline Pipe Industry Co., Limited (www.wilsonpipeline.com)
Tuesday, January 4, 2022
The installation of high pressure piping must be strictly required
Related Posts:
The performance of the 2205 duplex stainless steel elbow2205 duplex stainless steel elbow has excellent intergranular corrosion resistance and uniform corrosion resistance, both of which are better than 304… Read More
Basic precautions and standard welding of butt welding elbowButt welding elbow is a kind of using steel by hot pressing molding technology or forging forming technology of production of the elbow, the connectio… Read More
The design and manufacture of carbon steel elbowThe design and manufacture of carbon steel elbow must be considered when the hardness of the carbon steel elbow, so how to improve the hardness of the… Read More
Pumps Valves and Pipes Africa 2017Pumps Valves and Pipes Africa 2017International Trade Fair for Suppliers to the following industriesDate: 5/17/2017 – 5/19/2017Venue: Gallagher … Read More
The difference between bend and elbowBend and elbow the biggest difference is that one is the head, one is the tube. Although this is so, but they are two in the manufacturing process the… Read More
Standard Reference for Seamless Steel Pipe
1. Seamless steel tube for structure (GB / T8162-1999) is a seamless steel pipe for general structure and mechanical structure. 2. Seamles...

0 comments:
Post a Comment